Solutions · In development
Digital Twin
A working copy of your city’s traffic — change signal timings and plans in the model and see the effect before anything touches the real network. The Digital Twin is in development at NOW Wireless, built on the forecasting, tracking and AI that already run on our networks today.

What it is
Test tomorrow’s traffic before it happens
A Digital Twin is a software model of pedestrian, cycle and vehicle movement across a city. Change signal timings and traffic plans in the model — live, or against historical data — and see the effect before anything is rolled out. This page sets out what the Twin will do, and which parts already work today on deployed networks.
Where it stands
What works today, and what is being built
Available today Deployed
- Forecasting up to an hour ahead — in specified trials, air‑quality forecast accuracy has reached up to 95%
- Anonymous journey times, routes and origin‑destination data from Bluetooth, Wi‑Fi and ANPR (Automatic Number Plate Recognition)
- Smart Junction detection — counts, classification, queues and turn movements fed to Urban Traffic Control (UTC) and Urban Traffic Management and Control (UTMC)
- SenseView: one real‑time database holding it all, with history that can be replayed by junction and mode
In development Not yet a product
- Live simulation of the whole city one to three hours ahead, with signal‑timing changes tested in the model
- Historic replay — re‑run a past day with a different plan and compare
- Automated plan creation and roll‑out to compatible controllers where the predicted effect is positive
- City view on a workstation or an augmented reality (AR) headset
The Digital Twin and its simulation features are in development and are not available as a product today. Capabilities marked Deployed are available now.
What it will be
A working copy of your city
The Digital Twin models the city junction by junction. A live simulation will forecast traffic one to three hours ahead and let a city manager change signal timings to see the effect; a historic simulation will replay past flows so plans can be tested and refined. Improvements proven in the model are then rolled out to UTC and UTMC.
- Junction‑by‑junction model of vehicle, cycle and pedestrian movement
- Live and historic modes
- Changes proven in the model before they reach the street

The real city and its working copy.
Why it matters
Act on the next hour, not the last one
Conventional traffic management reacts to what has already happened. Forecasting where vehicles entering the city will go, and when they will arrive, means problems can be anticipated and the plan changed before congestion forms — by city managers, or by the AI under approved strategies. The same forecasts extend to air quality, so changes are made before an exceedance occurs, not reported after.

Flows modelled across the network, not junction by junction in isolation.
Patented technology
Junctions that know what is coming
NOW Wireless holds a patent for a method and system of predictive traffic flow and traffic light control. Wireless and CCTV sensors feed an AI that tells each junction what traffic it will receive from five minutes to an hour or more before it arrives — the foundation that makes a true Digital Twin possible, and lets city management adjust plans pre‑emptively or hand control to approved strategies.

Detection at the junction feeds the forecast for the junctions downstream.
Route probability
Every vehicle, a predicted path
As a vehicle enters the city, the AI assigns a probability to every junction it may pass through — and refines it at each junction as the journey unfolds, so accuracy increases along the way. Aggregated across every vehicle in the city, these probabilities build a forecast of vehicle counts at every junction in the network.
Probabilities assigned on entry and recalculated at each junction passed.
Journey time
From probability to arrival time
The AI calculates journey times for every vehicle moving through the city, updated second by second. Combining route probability with journey time turns forecasts into arrival times — when vehicles will reach each junction and which exits they will use — so signals can be optimised and plan changes made an hour or more ahead.

Journey times between every pair of junctions, updated continuously.
System inputs
Trained on billions of journeys
The AI draws on billions of recorded vehicle movements built up over years of city tracking — currently over 10 million transactions collected daily per city, tracking more than 750,000 journeys in many cities. Weather, events, roadworks and historical trends are added, so the forecast holds whatever the day brings.
Live and historic journeys, counts, weather, events and air quality in; signal timings and forecasts out.
Smart Junctions
Digitisation starts at the junction
Digital traffic signals use cameras and wireless detectors in place of loops in the road — a typical Smart Junction runs four cameras and a Bluetooth detector on one AI unit, and a single unit can manage three or more connected junctions over a wireless cluster. Virtual loops, ANPR, cycle tracking, vehicle classification, turn analysis and journey times all feed the central AI, which interfaces with UTC, UTMC and city managers.

Each digitised junction becomes a data source for the model.
Forecasting Deployed for air quality
One hour ahead — and three
The AI builds a forecast an hour ahead of current traffic from live tracking, historical data, weather, events and other relevant information — the same technology NOW Wireless already uses for air‑quality forecasting on deployed networks, where accuracy in specified trials has reached up to 95%. A three‑hour forecast extends the horizon for evaluating potential issues, with accuracy improving as the system learns from its previous forecasts.

Know what the evening peak will look like before it arrives.
Simulation In development
See it, change it, roll it out
Simulation software will display the city and its traffic flows — now, in one hour and in three — on a workstation or an augmented reality (AR) headset. Signal timing changes are tested in the model, and where the predicted impact is positive they are rolled out to compatible traffic controllers. Traffic plan creation and signal interaction can be automated to maximise throughput and reduce pollution.

Live traffic now, and the forecast one hour ahead, side by side.
Get involved
Build the twin on the tracking you already have
The Digital Twin grows out of Smart Junctions, journey‑time detection and SenseView — all available today. Talk to our engineers about laying that foundation now, and about early involvement in the Twin as it develops.